Featured Interviews

In conversation: a type designer on revival work

Theo Lindqvist

Motion Designer · Malmö

  • Jan 5, 2026
  • 2 min read
  • 11
In conversation: a type designer on revival work

On drawing from old specimens without making a museum piece. We asked the questions we usually only ask each other after hours.

How they got started

The most useful mistake was shipping a component nobody had asked for. It taught them to spend the first week of any project listening rather than drawing.

Studio photograph 3 from the Margin Notes archive
A quiet corner of the reference library.

A typical working week

A normal week is mostly conversation: two days of making, three of reviewing, answering questions, and saying no politely. The making days are protected on the calendar like client meetings.

Perfection is achieved, not when there is nothing more to add, but when there is nothing left to take away.

Antoine de Saint-Exupéry, Wind, Sand and Stars

What they are reading

For small teams the advice was blunt: pick fewer things, finish them properly, and write down why you said no. A system of two people can stay healthy if its scope is honest.

Our guest started out drawing lettering for shop signs before moving to screens. The habit of checking work from across the room, they said, still shapes every decision they make.

As always, the files and notes behind this piece are in the studio archive. Ask and we will share what we can.


Found this useful?

Theo Lindqvist

About the author

Theo Lindqvist

Motion Designer · Malmö

Theo designs interface motion and hosts the studio interview series. He believes most animations should be shorter, and most interviews should be longer.

Related dispatches

All posts

11 comments

Leave a comment

Already have an account? Log in

Your email is never shown.

  • Rafael Costa

    Jan 10, 2026

    Printed this out for the studio wall. Old habits.

  • Marcus Chen

    Author's pick Jan 10, 2026

    How long did the whole migration take, start to finish?

    Freya Hansen

    Jan 12, 2026

    Good question. I would guess it depends on how many teams consume the system.

  • Mei Lin

    Jan 11, 2026

    Would love a follow-up on how the team felt about the change after six months.

    Theo Lindqvist

    Author Jan 11, 2026

    Roughly six weeks, most of it spent on communication rather than code.

  • Nadia Haddad

    Jan 12, 2026

    Would love a follow-up on how the team felt about the change after six months.

    Elin Svensson

    Jan 16, 2026

    Agreed. The review step is where these efforts usually go to die.

  • Tomasz Nowak

    Author's pick Jan 17, 2026

    We tried something similar last year and stalled at the review step. Your agenda idea might unblock us.

  • Rafael Costa

    Jan 22, 2026

    Our accessibility audit flagged exactly this. Sharing with the rest of the team now.

  • Lena Vogel

    Author's pick Jan 25, 2026

    Our accessibility audit flagged exactly this. Sharing with the rest of the team now.

    Theo Lindqvist

    Author Jan 27, 2026

    Thanks for reading. We did measure it: review time dropped by about a third over two months.

Previous

Motion budgets: saying no to the fourth animation

Next

Five interviews that changed our navigation