Writing the spec after the prototype

Maren Okafor

Design Systems Lead · Rotterdam

  • Sep 14, 2026
  • 2 min read
  • 9
Writing the spec after the prototype

Why our best specs now describe something that already works. Process is only worth having if it makes the next release more boring than the last one.

The agenda that fits on a card

We write the spec after the prototype works. The document describes something real, links to it, and records the decisions we made along the way instead of guessing at them in advance.

Studio photograph 5 from the Margin Notes archive
The view that got us through a long release week.

Specs that describe working software

A feature is not done until its empty, loading, and error states are designed and built. Adding that line to our definition of done cost almost nothing and removed a whole class of support tickets.

Design is not just what it looks like and feels like. Design is how it works.

Steve Jobs, The New York Times Magazine, 2003

Keeping it lightweight

The single handoff meeting became three short check-ins across the sprint. Engineers see the work early, designers see the build early, and nobody is surprised on the last day.

Design review now runs on a twenty-five minute timer with three agenda items at most. Anything bigger becomes its own session, and the timer is visible to everyone so nobody has to be the bad guy.

We are still arguing about the last ten percent. That argument, it turns out, is where most of the useful work happens.

If you try any of this on your own team, we would love to hear what went differently. The best notes in this journal started as someone else’s correction.


Found this useful?

Maren Okafor

About the author

Maren Okafor

Design Systems Lead · Rotterdam

Maren runs the design system at Margin Notes Studio and has renamed more tokens than she will admit in public. She writes about process, adoption, and the social side of shared components.

Related dispatches

All posts

9 comments

Leave a comment

Already have an account? Log in

Your email is never shown.

  • Diego Morales

    Sep 15, 2026

    This matches our experience almost exactly. The renaming pass was painful, but nobody wants to go back.

  • Chiara Bianchi

    Sep 16, 2026

    This is the first explanation of the topic that did not assume I already knew the answer. Thank you.

  • Nadia Haddad

    Sep 17, 2026

    This matches our experience almost exactly. The renaming pass was painful, but nobody wants to go back.

    Maren Okafor

    Author Sep 18, 2026

    Fair challenge. In a bigger org I would start with one team and let the results do the persuading.

    Maren Okafor

    Author Sep 20, 2026

    Roughly six weeks, most of it spent on communication rather than code.

  • Aiko Tanaka

    Sep 17, 2026

    This matches our experience almost exactly. The renaming pass was painful, but nobody wants to go back.

  • Femi Adebayo

    Sep 18, 2026

    We shipped the same fix last month. Nice to know we were not the only ones fighting it.

    Tomasz Nowak

    Sep 20, 2026

    Good question. I would guess it depends on how many teams consume the system.

  • Hannah Brooks

    Sep 19, 2026

    How long did the whole migration take, start to finish?

Previous

Our definition of done now includes empty states

Next

Sketchbooks from a studio offsite