What we learned auditing 40 button variants
Maren Okafor
Design Systems Lead · Rotterdam
- Sep 20, 2026
- 2 min read
- 8
Counting every button in production turned a debate into a decision. Every system we have worked on eventually hits the same wall: the library is fine, but the agreements around it have gone soft.
Where the old names broke down
We started by listing every place a token name leaked its value. Names like blue-600 told you what the colour was, not what it was for, so every theme change turned into a find-and-replace across dozens of repositories.
- Give every component a named owner
- Name tokens by purpose, never by value
- Measure usage before deprecating
- Keep the release cadence predictable
What adoption actually looked like
Rather than a big-bang release we shipped aliases first. Old names kept working and pointed at the new ones, and a lint rule nudged people toward the new vocabulary one pull request at a time.
The power of the Web is in its universality. Access by everyone regardless of disability is an essential aspect.
Tim Berners-Lee
/* alias tokens point at globals, never at raw values */
:root {
--color-surface: var(--ink-50);
--color-accent: var(--magenta-500);
--radius-card: 24px;
}
Rolling it out without a freeze
The system team wrote a one-page naming guide and tested it against the ten most-used components. If a name needed a comment to explain it, the name lost. That rule alone removed a third of our proposals.
Adoption tracked trust more than tooling. Teams that had been burned by breaking changes waited, and the only thing that moved them was a boring, predictable release schedule kept for three months straight.
As always, the files and notes behind this piece are in the studio archive. Ask and we will share what we can.
Found this useful?
About the author
Maren Okafor
Design Systems Lead · Rotterdam
Maren runs the design system at Margin Notes Studio and has renamed more tokens than she will admit in public. She writes about process, adoption, and the social side of shared components.
Luis Ortega
Sep 20, 2026Saving this for our next team retro. The part about making decisions reversible is the bit I keep forgetting.
Jules Martin
Sep 20, 2026Really clear write-up. The list in the middle is going straight into our onboarding doc.
Chiara Bianchi
Sep 20, 2026Did you measure anything before and after? I would love to show numbers to our leadership.
Maren Okafor
Author Sep 20, 2026Roughly six weeks, most of it spent on communication rather than code.
Elin Svensson
Sep 20, 2026Good question. I would guess it depends on how many teams consume the system.
Oliver Grant
Sep 20, 2026This is the first explanation of the topic that did not assume I already knew the answer. Thank you.
Elin Svensson
Sep 20, 2026Really clear write-up. The list in the middle is going straight into our onboarding doc.
Maren Okafor
Author Sep 20, 2026Thanks for reading. We did measure it: review time dropped by about a third over two months.